During the making of section 19 of Cross Israel road Pakatz planned many bridges and road structures such as agricultural overpasses and underpasses, culverts, and retaining walls.
Investor: Cross Israel Ltd.
Head designer of the project: Mahod Ltd.
Bridge architect: Ethan Kimmel, Kimmel – Eschkolot Architecture
Landscape architect: Moriyah-Skali
Design period: 2002-2007
During the preliminary tender bridges crossing the Cross Israel road were made – two Timnah Watercourse bridges, overpass over Naan – Be’er Sheva railroad, road bridges on roads 383 and 353 and large culverts in the crossing of the railroad.
Operating contractor of the preliminary project: Ashkrit Ltd.
Design period: 2003 – 2005
For the tender to starting a system of agricultural overpasses Pakatz planned 5 overpasses in early design and 3 overpasses were completed in particularized design.
Operating contractor: Faber
Design period: 2004 – 2006
Agricultural overpass Cross Israel model
For two other tenders the following structures were made:
Main contractor: Roleder Ltd.
Bridge contractor: Ashkrit Ltd.
Two separate bridges in crossing the Ella watercourse
Two separate bridges in crossing the Govrin watercourse
Culverts and underpasses in the watercourses Rif, Barkai, Dakarin, Azrar culverts.
Main contractor: Olitski Ltd.
Bridge contractor: Ashkrit Ltd.
Two separate bridges in the crossing of Lachish watercourse.
Culverts.