TrainBridge-Natbag

Natbag Modein rw line– bridge 4

Girder Bridge made of three structures in a total length of approx 600.0 m. The bridge crosses the eastern railway to Lod and a future railway, access roads of the sub-station and road number 40.

Investor: Israeli Railways

Contractor: Minrav Ltd.

Design Period: 2004 – 2005

Cost of design: Approx 31,000,000.00 NIS

General Data:

Length: Approx 600.0 m.

Width: 11.0 m

Spans: up to 41.0 m.

The bridge is made of three structures:

Two pergola structures above an existing, designed railway.

Length of the structures about 90 m each and span about 16.0 m.

Girder Bridge with 13 spans in a total length of 420 m.