TrainBridge-Natbag

Natbag Modein rw line– bridge 9

Girder Bridge in the length of approx 180 m above Ayalon watercourse in the area of a designed park.

Investor: Israeli Railways

Contractor: Linom Ltd.

Design period: 2004 – 2005

Cost of design: Approx 9,500,000.00 NIS

General Data:

Length: Approx 180.0 m

Width: 11.0 m

Spans: 27.0 m