Cast in situ bridge in the full length of approx 120.0 m with a main span 54.0 m.
Investor: Israeli Railways
Contractor: Ramet Ltd.
Design period: 2004 – 2005
Cost of design: approx 8,000,000 NIS
General data:
Length: Approx 120.0 m
Width: 11.0 m
Spans: 54.0 m
Erection method: Cast in situ with posttensioning.
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il