Cast in situ bridge in the length of approx 300.0 m.
Investor: Moscow Government
Head designer: Soizdorproyect Ltd.
Operating contractor: ADM Bau Ltd. Austria
Design period: 1997
Cost of design: Approx 16,500,000.00 $
General Data:
Length: approx 300.0 m
Width: 12.0 m
Spans: 28.0 m
Structure type: Cast slab with posstensioning, height 1.2m.
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il