Bridge in the length of approx 175.0 m built using the Incremental Launching Method
Investor: Moscow Government
Head designer: Soizdorproyect Ltd.
Operating contractor: Elgad International Ltd.
Design period: 1997
Design cost: Approx. 16,300,000.00 $
General Data:
Length: approx 175 m
Width: 24.0m
Spans: 30.0 m
Structure type: Cast slab with posttensioning, height 1.2 m built using the Incremental Launching Method.
A bridge that is in a complex horizontal pass – is situated in curvy line with a 500m radius, klotoida and straight section built of two separate bridges connected in the end of the method to a final structure.