Girder bridge in the length of approx 80.0 m Investor: Cross Israel Ltd. Head designer: Mahoz Ltd. Contractor: Ashkrit Design period: 2003 – 2004 Cost of design: approx 3,600,000.00 NIS General Data: Length: Approx 80.0 m Width: 14.2 m Maximal …

Bridge 383 over cross Israel road section 19 Read More »

Bridge in the length of approx 155.0 m made as pergola with a span of approx 22.0 m. Investor: Cross Israel Ltd. Head designer: Mahod Ltd. Operating contractor: Ashkrit Design period: 2003 – 2004 Cost of design: Approx 15,000,000.00 NIS …

Naan-Be’er sheva-19 section of cross Israel road Read More »

Cast in situ bridge with posttensioning in the length of approx 80.0 m and the width of approx 35.0 from a Girder Bridge in the length of 40.0 m. Investor: Cross Israel Ltd. Contractor: Ashkrit Design period: 2003 – 2004 …

Timnah creak-cross Israel road course north Read More »

Cast in situ bridge with posttensioning in the length of approx. 80.0 m and the width of 35.0 m. Investor: Maatz Contractor: Cross Israel Ltd. Design period: 2003 – 2004 Cost of design: approx 4,000,000.00 m General Data: Length: 85.0 …

Timnah creak– Israek road south Read More »

Cast in situ bridge with posttensioning in the length of approx 80.0 m and the width of 35.0 m. Investor: Maatz Contractor: Shafir Eng. Design period: 2002-2003 Cost of design: approx 11,000,000.00 NIS General Data: Length: 80.0 m Width: 35.0 …

Bridge on road 471 Read More »

Girder Bridge in the length of approx 140 m Investor: Netivei Ayalon Contractor: Ramet Ltd. Design period: 1998 Cost of design: approx 6,500,000.00 NIS General Data: Length: 140.0 m Width: 22.0 m Spans: 32.2 m Structure type: tunnel beams height …

Kaplan bridge-Ayalon lanes east Read More »

Pakatz
Skip to content