Railway Tunnel 13 in Natbag-Modein
A tunnel in the length of approx 220m in the first railway interchange in Israel. Investor: Israeli Railways Operating contractor: Danya Sibus Design period: 2004 – 2005
A tunnel in the length of approx 220m in the first railway interchange in Israel. Investor: Israeli Railways Operating contractor: Danya Sibus Design period: 2004 – 2005
Railway tunnel crossing road number 1 close to Aneba interchange Investor: Israeli Railways Operating contractor: Linom Ltd. Contractor’s designer: Yaron-Shimoni-Shaham Design period: 2005