The upgrade of road 4 between Gan Yavne cross section to A.T cross section. Ad Halom in a narrowed down format without the interchanging of the cross sections shown here.
Constructive elements that were built during this project:
-Lachish stream bridges on road 4 and pedestrian bridges passing over the stream.
-Ashdod south interchange bridges
-Pedestrian bridges over railway
-Reconstruction of Mamluk bridge
-A lineout of drainage structures and retaining walls
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il