Projects

Adoriym bridge in Naan-Be’er sheva railroad

Girder Bridge in a total length of approx 450.0m overpass over Adoriym watercourse and Cross Israel road.

Investor: Israeli Railways

Main contractor: Bibi roads

Operating contractor: Shafir

General Data:

Length: approx 450.0 m

Width: 11.5 m

Spans: 33.0 m

Cost of design: approx 25,000,000 NIS

צרו

דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il

Pakatz