Projects

Agricaltural bridge naan

Agricaltural Overpass over in km 37+250

Girder bridge with two 23.6m spans.

Investor: Israeli Railways

Railway and road designer: Deker Building and Engineering Ltd.

Operating contractor: Malibu

Design period: 2006 – 2007

General Data:

General length of the bridge: approx 85.0m

Bridge opening: approx 47.5m

Bridge width: approx 8.0m

Spans: Approx 23.6m

Cost of design: approx 2,500,000.00 NIS

    צרו

    דרך מנחם בגין 52,
    תל אביב – יפו, ישראל
    טלפון: 03-7916916
    פקס: 03-7916917
    ד.אלקטרוני: orly@pakatz.co.il

    Pakatz
    Skip to content