Girder bridge in the length of approx 95.0m
Railway and road designer: Deker Building and Engineering Ltd.
Operating contractor: Malibu
Design period: 2007
General Data:
General length: approx 95.0m
Opening: approx 80.0m
Width: approx 8.0m
Spans: 18.0+21.0+21.0+18.0 m
Cost of design: approx 3,000,000.00 NIS
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il