Projects

RoadBridge

Bridge 383 over cross Israel road section 19

Girder bridge in the length of approx 80.0 m

Investor: Cross Israel Ltd.

Head designer: Mahoz Ltd.

Contractor: Ashkrit

Design period: 2003 – 2004

Cost of design: approx 3,600,000.00 NIS

General Data:

Length: Approx 80.0 m

Width: 14.2 m

Maximal span: 20.0 m

Structure type: Upside-down double T beams

    צרו

    דרך מנחם בגין 52,
    תל אביב – יפו, ישראל
    טלפון: 03-7916916
    פקס: 03-7916917
    ד.אלקטרוני: orly@pakatz.co.il

    Pakatz
    Skip to content