Bridge in the length of approx 155.0 m made as pergola with a span of approx 22.0 m.
Investor: Cross Israel Ltd.
Head designer: Mahod Ltd.
Operating contractor: Ashkrit
Design period: 2003 – 2004
Cost of design: Approx 15,000,000.00 NIS
General Data:
Length: Approx 155.0 m
Width: 22.0 m
Structure type: Pergola made of precast beams and cast on situ slab.
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il