Projects

TrainBridge-Natbag

Natbag Modein rw line– bridge 10

Girder Bridge in the length of approx 120m above Ayalon watercourse.

Investor: Israeli Railways

Contractor: Linom Ltd.

Design period: 2004 – 2005

Cost of design: Approx 9,500,000.00 NIS

General Data:

Length: approx 120.0 m

Width: 11.0 m

Spans: 27.0 m

    צרו

    דרך מנחם בגין 52,
    תל אביב – יפו, ישראל
    טלפון: 03-7916916
    פקס: 03-7916917
    ד.אלקטרוני: orly@pakatz.co.il

    Pakatz
    Skip to content