Bridge length is approx 256.0 m designed and built using the Incremental Launching Method.

Investor: Israeli Railways

Contracor: Danya Cebus Ltd.

Design period: 2004 – 2005

Cost of design: 20,500,000.00 NIS

General Data:

Length: approx 256.0 m

Width: 11.0 m

Spans: 45.0 m

Erection method: Incremental Launching Method.