TrainBridge-Natbag

Natbag Modein rw line– bridge 17

Cast in situ bridge in the full length of approx 120.0 m with a main span 54.0 m.

Investor: Israeli Railways

Contractor: Ramet Ltd.

Design period: 2004 – 2005

Cost of design: approx 8,000,000 NIS

General data:

Length: Approx 120.0 m

Width: 11.0 m

Spans: 54.0 m

Erection method: Cast in situ with posttensioning.