Girder Bridge made of three structures in a total length of approx 600.0 m. The bridge crosses the eastern railway to Lod and a future railway, access roads of the sub-station and road number 40.
Investor: Israeli Railways
Contractor: Minrav Ltd.
Design Period: 2004 – 2005
Cost of design: Approx 31,000,000.00 NIS
General Data:
Length: Approx 600.0 m.
Width: 11.0 m
Spans: up to 41.0 m.
The bridge is made of three structures:
Two pergola structures above an existing, designed railway.
Length of the structures about 90 m each and span about 16.0 m.
Girder Bridge with 13 spans in a total length of 420 m.