Projects

TrainBridge-Natbag

Rishonim railway overpass road 4313

Investor: Israeli Railways

Contractor: Elgad Ltd.

Design period: 2002-2003

Cost of design – Aprox. 6,000,000.00 NIS

General Data:

Length: Aprox 160.0 m

Width: Aprox 8.5 m

Spans: up to 44.0 m

Bridge deck in U box crossection because of Gabarit limitation done in Incremental Launching Method.

Design of the bottom structure and the design for the tender done by G.A.S Ltd.

    צרו

    דרך מנחם בגין 52,
    תל אביב – יפו, ישראל
    טלפון: 03-7916916
    פקס: 03-7916917
    ד.אלקטרוני: orly@pakatz.co.il

    Pakatz
    Skip to content