A bridge in the length of approx 110.0 m built using the Incremental Launching Method
Investor: Moscow government
Head designer: Soizdorproyect Ltd.
Operating contractor: Elgad International Ltd.
Design period: 1997
Design cost: Approx. 16,400,000.00 $
General Data:
Length: Approx 110 m
Width: 40.0 m
Spans: 30.0 m
Structure type: Cast slab with posttensioning, height 1.2m built using the Incremental Launching Method