A road the length of approx 520 m – exit from Natbag in the direction of Jerusalem. Investor: Maatz Contractor: Shafir Eng. Design period: 1999 Cost of design: approx 12,000,000 NIS General Data: Length of the bridge: 520.0 m Width …
interchange road natbag on road 1 Read More »
Investor: Moriyah Ltd. Contractor: Shafir Eng. Design period: 2001 Design of the bottom structure: Shafir, Pozner, Brown Cost of design: approx 16,500,000.00 NIS General Data: Length: 580.0 m Width: 12.9 m Spans: 36.0 m Structure type: Cast in situ slab with posttensioning, …
Shorek creak bridges on road 9 in Jerusalem Read More »
Investor: Maatz Operating contractor: Elgad Ltd. Design period: 1998 Cost of design: approx 10,000,000.00 NIS General Data: Length of bridge 252.0 m Width of bridge: 14.2 m Spans: 42.0 m Erection method: span-by-span using a special form work
Bridge in the length of 2,100.0m, made in two methods – cast in situ and Incremental Launching Method. Investor: Moscow Government Head designer: Promos Ltd. Operating contractor: Transmonolit Ltd. Design period: started in 2006, today in late stages of building …
Bridge-road to airport Vnukovo Read More »
Cast in situ bridge in the length of approx 70.0 m Investor: Moscow Government Head designer: Soizdorproyect Ltd. Contractor: Transstroy Ltd. Design period: 1998 Cost of design: approx 6,500,000.00 $ General Data: Length: approx 70.0m Width: 40.0 m Spans: 26.0 …
Demitrovsky bridge-outer ring road Moscow Read More »
Cast in situ bridge in the length of approx 600 m Investor: Moscow Government Head designer: Soizdorproyect Ltd. Contractor: Mostostroy Ltd. Design period: 1998 Cost of design: approx 15,300,000 $ General Data: Length: approx 600 m Width: 11.0 m Spans: …
Bridge In the Leningradsky way to Moscow Read More »
A bridge in the length of approx 110.0 m built using the Incremental Launching Method Investor: Moscow government Head designer: Soizdorproyect Ltd. Operating contractor: Elgad International Ltd. Design period: 1997 Design cost: Approx. 16,400,000.00 $ General Data: Length: Approx 110 …
Sholkovski bridge in Moscow Read More »
Bridge in the length of approx 175.0 m built using the Incremental Launching Method Investor: Moscow Government Head designer: Soizdorproyect Ltd. Operating contractor: Elgad International Ltd. Design period: 1997 Design cost: Approx. 16,300,000.00 $ General Data: Length: approx 175 m …
Slomia naris bridge in Moscow Read More »
Cast in situ bridge in the length of approx 300.0 m. Investor: Moscow Government Head designer: Soizdorproyect Ltd. Operating contractor: ADM Bau Ltd. Austria Design period: 1997 Cost of design: Approx 16,500,000.00 $ General Data: Length: approx 300.0 m Width: …
Moldogavardisky bridge in Moscow Read More »
Girder bridge in the length of approx 90m in crossing of road 353 overpass over section 19 of Cross Israel road. Investor: Cross Israel Ltd. Head designer: Mahod Ltd. Operating contractor: Ashkrit Design period: 2003 – 2004 Cost of design: …
Road bridge on road 353 over cross Israel road Read More »