A road the length of approx 520 m – exit from Natbag in the direction of Jerusalem.
Investor: Maatz
Contractor: Shafir Eng.
Design period: 1999
Cost of design: approx 12,000,000 NIS
General Data:
Length of the bridge: 520.0 m
Width of the bridge: 9.5 m
Spans: 32.2 m
Structure type: AASHTO VI beams
דרך מנחם בגין 52,
תל אביב – יפו, ישראל
טלפון: 03-7916916
פקס: 03-7916917
ד.אלקטרוני: orly@pakatz.co.il