Bridge in the length of 210 m with a main span of 78.0 m – biggest span between railroad bridges in Israel built in Balanced Cantilever Method. Investor: Israeli Railways Contractor: Ter-Arme Ltd. Design period: 2004-2005 Cost of design: approx …
Natbag Modein rw line– bridge 16 Read More »
Double track railway Girder Bridge in a total length of approx 70.0 m Investor: Israeli Railways Main contractor: Bibi roads Operating contractor: Shafir Design period: 2005 – 2006 General Data: Length: approx 70.0 m Width: 11.5 m Spans: approx 18+23.5+18 …
Roaf 3403 in railway Naan-Be’er sheva Read More »
Investor: Israeli Railways Contractor: Elgad Ltd. Design period: 2002-2003 Cost of design – Aprox. 6,000,000.00 NIS General Data: Length: Aprox 160.0 m Width: Aprox 8.5 m Spans: up to 44.0 m Bridge deck in U box crossection because of Gabarit …
Rishonim railway overpass road 4313 Read More »