Bridge in a total length of approx. 1100.0 m made of four structures. Investor: Israeli Railways Contractor: Solel-Bone Ltd. Design period: 2003-2006 Cost of design: Approx. 60,000,000 NIS General Data: Length: Approx. 1100.0 m Width: 11.0 m The bridge is …

NATBAG MODEIN RW LINE N. Read More »

Girder Bridge made of three structures in a total length of approx 600.0 m. The bridge crosses the eastern railway to Lod and a future railway, access roads of the sub-station and road number 40. Investor: Israeli Railways Contractor: Minrav …

Natbag Modein rw line– bridge 4 Read More »

Investor: Israeli Railways Contractor: Linom Ltd. Design Period: 2004-2005 Cost of design: 4,500,000.00 NIS General Data: Length: approx 90.0 m Width: 11.0 m Spans: up to 38.0 m. Girder bridge with 13 spans in a total length of approx 420 …

Natbag Modein rw line– bridge 8 Read More »

Girder Bridge in the length of approx 180 m above Ayalon watercourse in the area of a designed park. Investor: Israeli Railways Contractor: Linom Ltd. Design period: 2004 – 2005 Cost of design: Approx 9,500,000.00 NIS General Data: Length: Approx …

Natbag Modein rw line– bridge 9 Read More »

Girder Bridge in the length of approx 120m above Ayalon watercourse. Investor: Israeli Railways Contractor: Linom Ltd. Design period: 2004 – 2005 Cost of design: Approx 9,500,000.00 NIS General Data: Length: approx 120.0 m Width: 11.0 m Spans: 27.0 m

Bridge in the length of approx 560.0 m overpassing Cross Israel road with spans up to 42.0 m. The bridge is made of three sections – one main section designed and executed in Incremental Launching Method and two cast in …

Natbag Modein rw line– bridge 11 Read More »

Bridge length is approx 256.0 m designed and built using the Incremental Launching Method. Investor: Israeli Railways Contracor: Danya Cebus Ltd. Design period: 2004 – 2005 Cost of design: 20,500,000.00 NIS General Data: Length: approx 256.0 m Width: 11.0 m …

Natbag Modein rw line– bridge 14 Read More »

Bridge in the length of approx 450.0 m designed and built in Incremental Launching Method. Investor: Israeli Railways Contractor: Ramet Ltd. Design Period: 2004 Cost of design: approx 26,000,000.00 NIS General Data: Length: Approx 430.0 m Width: 11.0 m Spans: …

Natbag Modein rw line– bridge 15 Read More »

Girder Bridge in a total length of approx 450.0m overpass over Adoriym watercourse and Cross Israel road. Investor: Israeli Railways Main contractor: Bibi roads Operating contractor: Shafir General Data: Length: approx 450.0 m Width: 11.5 m Spans: 33.0 m Cost …

Adoriym bridge in Naan-Be’er sheva railroad Read More »

Cast in situ bridge in the full length of approx 120.0 m with a main span 54.0 m. Investor: Israeli Railways Contractor: Ramet Ltd. Design period: 2004 – 2005 Cost of design: approx 8,000,000 NIS General data: Length: Approx 120.0 …

Natbag Modein rw line– bridge 17 Read More »

Pakatz
Skip to content